Transportation / Transit

35W Bridge

Transportation Project

View Gallery

EVS was selected by the Flatiron-Manson team (Flatiron, Figg, TKDA) to lead the overall survey effort for the I-35W Bridge Reconstruction project. EVS’ Survey Manager was the overall survey manager for the project. EVS was responsible for all survey activities including coordination, scheduling, overall quality control, and managed four survey crews on this project. EVS crews performed design surveys as well as construction staking. EVS’ work was featured as a cover story in POB magazine, a national survey industry magazine.